http://www.kopec.co.kr
1. 2. MMIS Package 3. 4. 5. -1-
CNMT SPRAY FAN CLR H2 IGNTR PAT H ISO C N M T E N V IR N PEN FLO W H2 H2 PURGE RE CO M SIP2 FL OW CSP2 TEMP SCP2 SIP4 C N M T IS O PEN F LO W PATH CNTL TEMP FLOW SIP1 CSP1 TEMP SCP1 SIP3 FLOW FLOW FLOW FLOW TEMP SC Hx B FL OW SC Hx A FL OW CCW SU R TK B CCW SU R TK A FLOW RX TRIP SAFETY INJ CIR SAFETY INJ R E AC T IV IT Y C N T L NATUR RO D CNTL CV CS BOR CCW PP B CCW PP A FL OW CCW Hx CCW Hx ESW PP B ESW PP A AUX FEED C O R E H E AT R E M FORCED CIR PRESS SIT 2 PRESS SIT 4 PR ESS SIT 1 PR ESS SIT 3 H2 R C S H E AT R E M MAIN FEED STARTUP FEED SHUTDN CLNG SI C I HEAT RATE PW R LMT LMT SAFETY DEPRESS RDT IR WST Rx PWR PWR SM SM PRESS ASI ASI COR E A VG PWR PWR DNBR DN BR SAFETY INJ MG N T O PW R OPER LMT LMT Rx HVT IR W ST CAVITY R C S IN V C N T L CV CS CHG & LDN C S T Av g / T R ef TEMP KNGR LARGE DISPLAY PANEL ON SFP SAFETY INJ RCG V PRI RLF CEA POSI S/U RATE PO SI RATE RAD R C S P R E S S C N T L PZR HTR & SPRAY CVCS CHG & LDN CV CS A UX SP RA Y S/G STMNG COL D CET COLD COL D TEMP PR ESS RAD CET SAFETY DEPRESS RCP 2A RCP F/R F/R RCP 2B HOT COLD C R E V F B E V C P I CR HVAC ISO DAM POSI PRESS RCP F/R F/R PRESS RCP 1B HOT RCP F/R F/R RCP 1A RCP F/R F/R FL OW FLOW ANNULUS FAN RAD M O D E : N O R MSFSC: A L SPTA CEA TRBL Rx TRIP INSER LIMIT TBN TRIP AF MSSV MSSV FLOW AFIV FLOW AFIV HP HTR REGEN Hx COLSS TRBL AUX B/D RAD FLOW AFIV FLOW AFIV MSADV MSIV MSADV MSIV AFCV MS PR ESS AFWP B PRESS AFC V AFWP D PR ESS AFCV AFWP C PR ESS AFWP A AFCV IPS TRBL LD N Hx IA TRBL RAD RAD FLOW FLOW LDNCV CHGCV FLOW FLOW IO N EXCH RLS PATH ISO TSV TSV C HG PP2 R AD EMISSION RLS PATH M ON & CNTL TC V TC V TB V TB V AF W ST B AFWST A VC T C HG PP1 CHG PP3 (SEAL INJ) LP H TR FWP A FWP B FWP C S/U FWP BAM PP1 BAM PP2 RMW PP1 RMW PP2 EMER D/G STBY AUX XFMR VIT AL STATN BAT MSR B MSR A BAST RMWT VITAL AU X CD P A CD P B CDP C DEAER ATO R UNIT AUX XFMR AAC D/G N-VITAL STATN BAT PR ESS 22 KV MAIN GEN VA C U UM PP STM FEED H E AT R E J MAIN STM CNDSR CNDNST CIR WTR ATM DUMP TBN BYPASS CWP A CWP B CW P C CWP D CWP E CW P F 120 V AC 12 5V DC NET / GR OSS WATT EXCIT N-1 E 13.8 KV N-1 E D/G 480 V LC UPS SWYD MTR 345 KV SAT 13.8 KV 13.8 KV 4.1 6 KV LC 48 0V ELEC GE T/G T/G CNTL MDS D/G D/G CNTL SWYD 3 45 KV N-1E 4.16 KV 1E D/G 4.16KV 1E 4.16KV SYNC SC O PE 12 0V AC 12 5V DC 1. -2-
1. () -3-
1. () -4-
1. () KSNP 3,4 1,2 3,4 LOOP Platform Backup Switch Software Hardware Backup Switch -5-
1. () KSNP 3,4 MMI () 1,2 3,4 (SPDS) (PCS), (PMAS) (PAS) (PMAS) (SPADES),, - (Radwaste Large Display Unit ) -, DCSPlatform (DCS,, ) DCS (CFM/SPM) Compact Workstation (Video Display Unit, VDU) - - -6-
2. MMIS Package NSSS I & C MMIS - BOP MCR MCR RSR TSC /EOF CPTR RM I&C EQ RM RCR /LCR MCR PPS / CPC OM QIAS -P Pos. 4 Disply Safety Console Operation Console LDP RSC SODP Monitoring Console ES MTP Operation Console T/G MMI PPS -RPS -ESFAS -CPCS NSSS Mon Sys -RMS-N -NIMS -FIDAS -QIAS-P PCS - Power Elec Equip - BOP Control Process -CCS IPS - Database -HDSR -CPS(KHNP) ESF -CCS -BOP ESFAS - Load Seq QIAS -N BOP Mon Sys -RMS-B -CMS -SMS - CCTV -VMS T/G Control & Monitoring System ENFMS PCS -RRS -RPCS - DRCS -NPCS -DPS -NAPS - NSSS ESFAS Diverse Manual ESF Actuation RSPT / RTSS PPS Sensor / Excore Det. ICI / NIMS Sensor CEDM / MG SET Sensor / Actuator Sensor / Actuator Sensor / Actuator Sensor / Actuator PKG Designer Supplier MMIS-BOP KOPEC A /E Doosan /WEC NSSS-IC KOPEC SD Doosan /WEC BOP-Moni. KOPEC A /E BOP Vendors TG Cont. KOPEC A /E T /G Vendor Sensor/Act. KOPEC A /E, SD BOP Vendors/Doosan NSSS I &C integrated in MMIS -BOP -7-
2. MMIS Package () DOR( MMI ) A/E : MMI,,, MMIS-BOP NSSS : NSSS I&C MMI KHNP : (CPS) -8-
2. MMIS Package () SD CD/ES MMIS-BOP A/E.. DHICO (WEC).. NSSS-I&C DHICO (SD) DHICO (WEC) KOPEC A/E provides System Design for MMIS MMIS-BOP. KOPEC A/E reviews and approve Supplier's documents. KOPEC A/E provides a design guide for NSSS I&C MMI design. Doosan/KOPEC SD provides NSSS system design data and signal interface requirements for MMIS-BOP -9-
3. (Proven Technology) MMIS,., 3,,. -10-
3. (Diversity Design). PPS, CPS, QIAS-P, ESF-CCS, QIAS-N DCS.,, GUI,. -11-
3. (Soft Control) ESF-CCS soft control display. DCS workstation. -12-
3. (Reliability) MMIS MTBF 50. MMIS MTTR 4. MMIS 99.99%. FMEA. -13-
3. (Segmentation) ESF-CCS P-CCS. ESF-CCS P-CCS (Segmentation). -14-
3. (Fault-tolerance),,,,.. fail-over. IPS silent failure QIAS-N. -15-
3. (Performance Requirement) (Response Time) ESF-CCS On/Off : 110msec Analog : 130msec P-CCS On/Off : 200msec (Normal) /100msec (Fast) Analog : 200msec (Normal) /100msec (Fast) -16-
3. (Performance Requirement) (Network Load) ESF-CCS 30%~50%. (Periodic Data Update) Statebased.(Event-based ) -17-
3. Software Program Manual (SPM).. Protection (Safety Critical) Important to Safety (ITS) Important to Availability (ITA) General Purpose -18-
3. (Maintainability).. IEEE-603 338 On-Line -19-
3. (Seismic Requirement) IEEE-344 Peak Ground Acceleration 0.3g (KSNP : 0.2g) GA KSNP 1.5~1.8 FRS curve. -20-
3. (Accuracy) DCS QIAS-N Accuracy 0.1%. Accuracy full scale 0.1%. -21-
4. DBE DBE / EOP, -22-
4. Soft Control CS CS CS CS Channel A CCS Channel B CCS Channel C CCS Channel D CCS -23-
4. -24-
4. () -25-
4. () RO, TO, EO Console -26-
4. () STA, SS, Safety Console -27-
4. (1), -28-
4. () CCG 2 Network Network Confirm Switch CCG CCG, Network ESF-CCS (Safety Critical ) CCG -29-
4. Information FPD Non-Class 1E / ITA (Important-to-Availability) (FPD) Class 1E / ITS (Important-to-Safety) Soft Control Network Class 1E / ITS Class 1E / Safety Critical ( ) Control Channel Gateway (CCG) Class 1E / Safety Critical -30-
5. 3,4 MMIS APR1400,,,, -31-