์๋ ฅ๋ฐฉ์ถ๋ฐธ๋ธ๋ฐ์ฉ๋์ํ์ค๋น๊ฐ์ ์ 14 ํ์์๋ ฅ์์ ๊ธฐ์ ์ ๋ณดํ์ ์ถฉ๋จ์ฒ์์๋์ ๋ 63-6, ์ผ์ / ๊ธฐ์ ๋ณธ๋ถ์ฅ์ด์ํฌ Tel. 041-562-3401 (511) 2009. 4. 6 ๊ธฐ์ ์ฐ๊ตฌ๋ถ
๋ชฉ์ฐจ 1 ์๋ ฅ๋ฐฉ์ถ๋ฐธ๋ธ์๊ฐ์ 2 ๋ฐธ๋ธ์ฑ๋ฅ์ํ์ค๋น์์ข ๋ฅ 3 ํด์ธ PRD ์ฉ๋์ํ์ค๋นํํฉ 4 ์ผ์ ๋ฐธ๋ธ์ฑ๋ฅ์ํ์ค๋น๊ฐ์ 5 ์ผ์ PRD ์ฉ๋์ํ์ค๋น๊ฐ์
1. ์์ ๋ฐฉ์ถ๋ฐธ๋ธ์๊ฐ์ 1.1 ์์ ๋ฐฉ์ถ๋ฐธ๋ธ์์ข ๋ฅ SAFETY VALVE RECLOSING PRESSURE RELIEF VALVE SAFETY RELIEF VALVE RELIEF VALVE PRESSURE RELIEF DEVICES PILOT OPERATED PRESSURE RELIEF VALVE POWER ACTUATED PRESSURE RELIEF VALVE NON-RECLOSING PRESSURE RELIEF DEVICES RUPTURE DISC DEVICES
1. ์์ ๋ฐฉ์ถ๋ฐธ๋ธ์๊ฐ์ 1.2 ์์ ๋ฐฉ์ถ๋ฐธ๋ธ์๊ตฌ์กฐ๋ฐํน์ง Solid Type
1. ์์ ๋ฐฉ์ถ๋ฐธ๋ธ์๊ฐ์ 1.2 ์์ ๋ฐฉ์ถ๋ฐธ๋ธ์๊ตฌ์กฐ๋ฐํน์ง Flexible Type
2. ๋ฐธ๋ธ์ฑ๋ฅ์ํ์ค๋น์ข ๋ฅ 2.1 ASME QME-1/KEPIC MFC ์๋ฐ๋ฅธ Functional Qualification Test ์ค๋น Active Power Operated Valve ์ฑ๋ฅ์ํ Active Self Operated dcheck kvalve ์ฑ๋ฅ์ํ Active Safety Relief Valve ์ฑ๋ฅ์ํ 2.2 ASME PTC 25 ์๋ฐ๋ฅธ PRD(Pressure Relief Device) ์ฑ๋ฅ์ํ์ค๋น Pressure Relief Device ์ฑ๋ฅ์ํ
2. ๋ฐธ๋ธ์ฑ๋ฅ์ํ์ค๋น์ข ๋ฅ 2.3 ASME QME-1/KEPIC MFC ์๋ฐ๋ฅธ Functional Qualification Test ๊ตฌ๋ถ ์ฑ๋ฅ๊ฒ์ฆํญ๋ชฉ ์ ์ฉ๊ตฌ๋ถ APOV ASOCV APRV 1 ์ํ์ ๊ฒ์ฌ (Pretest Inspection) 2 3 4 ์ฑ๋ฅ๋ฐ๋์ค - ๊ธฐ์ค์ (Performance and Leakage - Baseline) ๊ธฐ๋ณธ์ง๋์๊ฒฐ์ (Fundamental Frequency Determination) ํ๊ฒฝ๊ณผ๊ฒฝ๋ ์ดํ๋ชจ์ฌ (Environmental and Aging Simulation) ํด๋น์ ํด๋น์ ํด๋น์ 5 ์ค๊ฐ๊ฒ์ฌ (Intermediate Inspection) 6 ์ฃผ๊ธฐ์ํ ( ์์จ๋ฐ๊ณ ์จ )(Cycle Test) ํด๋น์ 7 ๋จ๋ถํ์ค์ํ (End-Loading Test) 8 ๋ด์ง์ํ (Seismic Test) ํด๋น์ - ๋ท์ฅ๊ณ์ -
2. ๋ฐธ๋ธ์ฑ๋ฅ์ํ์ค๋น์ข ๋ฅ ๊ตฌ๋ถ 9 10 ์ฑ๋ฅ๊ฒ์ฆํญ๋ชฉ ๋ฐฐ์ถ๊ด๋ฐ๋ฐ๋ ฅํ์ค๊ฒ์ฆ์ํ (Discharge-Pipe and Reaction-Loading Qualification Test) ๋ด์ง๋ฐ๋ฐฐ์ถ๊ดํ์ค์กฐํฉ์ํ (Combined Seismic and Discharge-Pipe Loading Test) ์ ์ฉ๊ตฌ๋ถ APOV ASOCV APRV 11 ์ธ๋ถํ๊ฒฝ์ํ (External Environment Test) 12 ์ด์ํฅ์ํ (Thermal Effects Test) 13 14 ์ ๋์ฐจ๋จ๊ณผ๊ธฐ๋ฅ๋ฅ๋ ฅ์ ์ฆ (Flow Interruption and Functional Capability Demonstration) ์ฑ๋ฅ๋ฐ๋์ค-์ต์ข (Performance and Leakage - Final) 15 ์ํํ๊ฒ์ฌ (Post Test Inspection)
2. ๋ฐธ๋ธ์ฑ๋ฅ์ํ์ค๋น์ข ๋ฅ 2.4 ASME PTC 25 ์๋ฐ๋ฅธ PRD(Pressure Relief Device) ์ฑ๋ฅ์ํ Popping Test ์ค์ ์๋ ฅ์์์ด๋ฆฌ๊ธฐ์์ Chattering ์์ด full Open Blow down Test ์์คํ ์์์๊ตฌํ๋์ ์ฒด์ฉ๋๋ถ์ถ ๊ท์ ๋ Blow down ๋ด์์ Reseating
3. ํด์ธ PRD ์ฉ๋์ํ์ค๋นํํฉ Name Certification No. Issued Expires Fluid (s) Pressur e Size Capacity Authorized Observers ANDERSON GREENWOOD CROSBY (Texas) PRD-017 05/02/97 07/02/02 Nitrog en 1000 psi 8" Water 1000 psi 4 10-40000 scfm 36-1400 gpm 200-28000 Steam 1000 psi 4 pph ANDERSON GREENWOOD Air 1000 psi 4 7000 scfm PRD-001 02/22/01 02/27/06 CROSBY (Massachusetts) Water 290 psi 4 600 gpm 3 ๋ช 6 ๋ช Water 3600 psi 1-1/2 30 gpm BS&B SAFETY SYSTEMS, INC. (Oklahoma) PRD-019 03/30/99 03/30/04 Air 275 psi 4 2000 scfm 4 ๋ช CONTINENTAL DISC CORP. (Missouri) PRD-011 07/02/99 08/17/04 Air 200 psi 4 7200 scfm Air 650 psi 4 6000 scfm Water 650 psi 4 900 gpm 4 ๋ช DRESSER FLOW CONTROL, DRESSER, INC. (Louisiana) PRD-008 04/24/97 05/12/02 Steam 290 psi 4 10000 pph Air 500 psi 4 3500 scfm Water 500 psi 4 500 gpm 6 ๋ช - ๋ท์ฅ๊ณ์ -
3. ํด์ธ PRD ์ฉ๋์ํ์ค๋นํํฉ Name Certification No. Issued Expires Fluid(s) Pressur e Size Capacity Authorized Observers ELECTRICITE DE FRANCE (Oklahoma) PRD-022 04/03/01 04/03/06 Steam 1400 psi 3 936 m 3 /h 1 ๋ช ENGINEERED CONTROLS INTERNATIONAL, INC. (North Carolina) PRD-020 01/13/00 01/13/05 Nitrogen 500 psi 3" 100-15000 scfm 4 ๋ช FARRIS ENGINEERING (Ohio) FIKE CORPORATION (Missouri) Air 880 psi 6 8000 scfm PRD-021 01/31/01 01/31/06 5 ๋ช Water 600 psi 4 165 gpm PRD-023 08/28/01 08/28/06 Nitrogen 285 psi 2 7000 scfm 2๋ช LESER GMBH & COMPANY KG (Germany) PRD-014 04/04/00 12/23/04 Air 1450 psi 16 24964 scfm Water 610 psi 16 1057 gpm 6 ๋ช THE NATIONAL BOARD OF BOILER & PRESSURE VESSEL INSPECTORS (Ohio) Steam 500 psi 4 16000 pph PRD-016 05/04/01 05/21/06 Air 500 psi 6 13000 scfm 5๋ช Water 500 psi 4 550 gpm - ๋ท์ฅ๊ณ์ -
3. ํด์ธ PRD ์ฉ๋์ํ์ค๋นํํฉ NBBI Testing Laboratory Steam Air Water Media Dry Saturated Steam Compressed Air Ambient temp. Water Maximum Source Pressure 850 psig (58 bar) 2,200 psig (151 bar) 625 psig (43 bar) Flow Sharp-edged orifice Sonic flow nozzle Sharp-edged orifice Measurement plates & weighed & sharp edged orifice plates & timed weight Prime Meters condensate method Plate method Maximum Flow Capacity 20,000 lbs. saturated steam per hour (9,070 kg/hour) 15,000 SCFM (25,000 m 3 /hour) 550 gal./min. (2,080 liters/min.) Test Vessel: MAWP Nozzle Connection 625 psig (43 bar) 4 inches (100 mm) 720 psig (49 bar) 4 inches (100 mm) 720 psig (49 bar) 3 inches (75 mm)
4. ์ผ์ ๋ฐธ๋ธ์ฑ๋ฅ์ํ์ค๋น๊ฐ์ 4.1 STEAM GENERATOR(TEST BOILER) Design Temperature : 750 Design Pressure : 2500 psig Steam Capacity :24ton/hr 2.4 Dry Saturated Steam (Steam Quality : 98% Min.)
4. ์ผ์ ๋ฐธ๋ธ์ฑ๋ฅ์ํ์ค๋น๊ฐ์
4. ์ผ์ ๋ฐธ๋ธ์ฑ๋ฅ์ํ์ค๋น๊ฐ์
4. ์ผ์ ๋ฐธ๋ธ์ฑ๋ฅ์ํ์ค๋น๊ฐ์ 4.2 HOT WATER TEST FACILITY Source Vessel Design Pressure : 3200 psig Design Temperature : 650 Capacity :5m 3 2 Vessels Test Vessel Design Pressure : 2500 psig Design Temperature : 650 Capacity : 8 m 3
4. ์ผ์ ๋ฐธ๋ธ์ฑ๋ฅ์ํ์ค๋น๊ฐ์
4. ์ผ์ ๋ฐธ๋ธ์ฑ๋ฅ์ํ์ค๋น๊ฐ์ 4.3 ๋ฐธ๋ธ์ฑ๋ฅ์ํํญ๋ชฉ Hot / Cold Cycle Test Flow Interruption ti / Initiation Test Flow Reversal Test (Check Valve) Disc-to-Seat Wedge-Lock Evaluation Test (Check Valve) Fully Open Valve Disc Flow Test (Check Valve) Others
4. ์ผ์ ๋ฐธ๋ธ์ฑ๋ฅ์ํ์ค๋น๊ฐ์
4. ์ผ์ ๋ฐธ๋ธ์ฑ๋ฅ์ํ์ค๋น๊ฐ์
4. ์ผ์ ๋ฐธ๋ธ์ฑ๋ฅ์ํ์ค๋น๊ฐ์ PIPE REACTION END LOADING & STATIC SEISMIC TEST For Small, Medium & Large Valves Size : 1/2 ~36 Seismic Test
4. ์ผ์ ๋ฐธ๋ธ์ฑ๋ฅ์ํ์ค๋น๊ฐ์ End-Loading Test
4. ์ผ์ ๋ฐธ๋ธ์ฑ๋ฅ์ํ์ค๋น๊ฐ์ 4.4 MOV DIAGNOSTIC EQUIPMENTS(3 Sets) QUIKLOOK (Teledyne Brown Engineering Inc.) MOVIDS (M&D Inc.) VIPER20 (Crane Nuclear Inc.)
5. ์ผ์ PRD ์ฉ๋์ํ์ค๋น๊ฐ์ 5.1 PTC 25 ์๋ฐ๋ฅธ PRD ์ฉ๋์ํ์ค๋น
5. ์ผ์ PRD ์ฉ๋์ํ์ค๋น๊ฐ์
5. ์ผ์ PRD ์ฉ๋์ํ์ค๋น๊ฐ์ ์ค๋น๊ฐ์ 1) Media - Dry Saturated Steam (98% ์ด์์ Quality) - Nitrogen - Water (Ambient/Hot) 2) Design Temperature : 650 3) Design Pressure : 2500 psig 4) Source Vessel : 8 m3 5) Test Vessel : 1 m3 6) Metering Section : NPS 4 7) Popping & Blowdown Tests EXPECTED UNCERTAINTY 1) PTC 19.1 ์ ์ฐจ์๋ฐ๋ผ๊ณ์ฐ 2) Flow Measurement : ± 2.0 % ์ด๋ด 3) ๊ธฐํ์ธก์ ๊ฐ : ± 0.5 % ์ด๋ด
5. ์ผ์ PRD ์ฉ๋์ํ์ค๋น๊ฐ์ CALIBRATION OF INSTRUMENTS 1) Pressure (1) Measuring Instrument - PTC 19.2์๋ฐ๋ฆ - ์ฃผ๊ธฐ : Before and after any test or series of tests (2) Indicator/Recorder de - ๊ตญ๋ด๊ฒ๊ต์ ๋ฒ์๋ฐ๋ฆ 2) Temperature (1) Measuring Instrument - PTC 19.3 ์๋ฐ๋ฆ - ์ฃผ๊ธฐ : Within 90-day period preceding the test or series of tests (2) Indicator/Recorder - ๊ตญ๋ด๊ฒ๊ต์ ๋ฒ์๋ฐ๋ฆ 3) Lift Indicators & Recorder (1) Measuring Instrument - ๊ตญ๋ด๊ฒ๊ต์ ๋ฒ์๋ฐ๋ฆ - ์ฃผ๊ธฐ : Before and after each test or series of tests (2) Indicator/Recorder - ๊ตญ๋ด๊ฒ๊ต์ ๋ฒ์๋ฐ๋ฆ
5. ์ผ์ PRD ์ฉ๋์ํ์ค๋น๊ฐ์ 4) Weighing Scales : ์ฌ์ฉ์น์์ 5) Steam Calorimeter - PTC 19.11 ์๋ฐ๋ฆ - ์ฃผ๊ธฐ : ์ต์ด์ค์น์,6 ๊ฐ์์ด๋ด๋ง๋ค์ํ 6) Meter Section : PTC 19.5 ์๋ฐ๋ฆ
์ต๊ณ ์ํ์ง์์ถ๊ตฌํ๋์ผ์