ๆญฏ์—”์ง€๋‹ˆ์–ด๋ง.PDF



Similar documents
ๆญฏTrap๊ด€๋ จ.PDF

์†Œ๊ฐœ.PDF

X-VA-MT3809G-MT3810G-kor

(Table of Contents) 2 (Specifications) 3 ~ 10 (Introduction) 11 (Storage Bins) 11 (Legs) 11 (Important Operating Requirements) 11 (Location Selection)

(ํŠน์ˆ˜์„ ) ์žฅ์น˜ ใ† ์žฅ์น˜ /์ ‚์ž/ ใ† ์žฅ์น˜๋„ ๊ฒฝ๋ ฅ ๋ณด์œ ์ž ใ† ์žฅ๋น„ ๋ฐฐ์น˜ ๊ฐ€๋Šฅ์ž ใ†๋ฐฐ๊ธฐ๊ด€ ๋ฐฐ์น˜ ๋ฐ ์ƒ์„ธ ์ฒ ์˜์žฅ ใ†ํ•จ์ • ๋ฐ ์ƒ์„ ์˜ ๋ฐฐ๊ธฐ๊ด€ ๋ฐ ๋ฐฐ์น˜, ใ†๋ฐฐ๊ธฐ๊ด€ ์ƒ์„ธ/์ƒ์‚ฐ ๊ฐ€๋Šฅ์ž ๊ธฐ๊ด€์‹ค ํ†ตํ’๋Ÿ‰ ๊ณ„์‚ฐ ๋ฐ ๋•ํŠธ ๋ฐฐ์น˜ ใ†๊ธฐ๊ด€์‹ค ํ†ตํ’๊ณ„ํ†ต ๊ฒฝ๋ ฅ์ž ๊ธฐ์žฅ ใ†์ˆ˜์ƒํ•จ, ์ž ์ˆ˜ํ•จ, ํŠน์ˆ˜์„ ๋ฐ•์˜ ๋ฐฐ

ๆญฏcoolingtower๊ฐœ์š”_1_.PDF

(specifications) 3 ~ 10 (introduction) 11 (storage bin) 11 (legs) 11 (important operating requirements) 11 (location selection) 12 (storage bin) 12 (i

ๆญฏRCM

๊ธฐ๋Šฅ.PDF

Coriolis.hwp

ๆญฏ๊ตญ๋ฌธ-Heatran์†Œ๊ฐœ์ž๋ฃŒ1111.PDF

02 Reihe bis 750 bar GB-9.03

-์‹œ๋ฐฉ์„œ ๋ชฉ์ฐจ- 1. ๊ณต ์‚ฌ ๊ฐœ ์š” 1 2. ์ด ์น™ 2 ์ œ 1 ์žฅ. ๊ฐ€ ์„ค ๊ณต ์‚ฌ 8 ์ œ 2 ์žฅ. ๋ชฉ ๊ณต ์‚ฌ 9 ์ œ 3 ์žฅ. ์ˆ˜ ์žฅ ๊ณต ์‚ฌ 10 ์ œ 4 ์žฅ. ์ฐฝ ํ˜ธ ๊ณต ์‚ฌ 21 ์ œ 5 ์žฅ. ์œ  ๋ฆฌ ๊ณต ์‚ฌ 27 ์ œ 6 ์žฅ. ๋„ ์žฅ ๊ณต ์‚ฌ 34 ์ œ 7 ์žฅ. ์ฒ  ๊ฑฐ ๊ณต ์‚ฌ

<453A5C736F6E67616D656E675CBBE7BFEBBCB3B8EDBCAD26C4ABB4D9B7CF2E2E2E>

GLHPS-D

Vertical Probe Card Technology Pin Technology 1) Probe Pin Testable Pitch:03 (Matrix) Minimum Pin Length:2.67 High Speed Test Application:Test Socket

Turbine Digital Flowmeter SEMI U+ ํŠน์ง• PVC, PTFE, P.P, PVDF ๋“ฑ ๋‹ค์–‘ํ•œ ์žฌ์งˆ Size, ์œ ๋Ÿ‰, Connection๋ณ„ ์ฃผ๋ฌธ์ œ์ž‘ ์ •๋ฐ€์„ฑ, ๋‚ดํ™”ํ•™์„ฑ์ด ์šฐ์ˆ˜ 4~20mA, Alarm, ํ†ต์‹ (RS485) ๋“ฑ ์ถœ๋ ฅ ์ œํ’ˆ๊ณผ Controll

ๆญฏDCS.PDF

๋‚˜์‚ฌ์‹๋ณผ๋ฐธ๋ธŒ.indd

< C6AFC1FD28B1C7C7F5C1DF292E687770>

VOL /2 Technical SmartPlant Materials - Document Management SmartPlant Materials์—์„œ ๊ธฐ๋ณธ์ ์ธ Document๋ฅผ ๊ด€๋ฆฌํ•˜๊ณ ์ž ํ•  ๋•Œ ํ•„์š”ํ•œ ์„ธํŒ…, ํŒŒ์ผ ์—…๋กœ๋“œ ๋ฐฉ๋ฒ• ๊ทธ๋ฆฌ๊ณ  Path Type์ธ Ph

<BACEBDBAC5CD20BAEAB7CEBCC52D A2DC3D6C1BE2D312D E6169>

Pilot Operated Regulator 1098-EGR ์šฉ๋„ ๋„์‹œ๊ฐ€์Šค์ง€๊ตฌ์ •์••๊ธฐ (City Gate Station, Main Station) ๋„์‹œ๊ฐ€์Šค์ง€์—ญ์ •์••๊ธฐ (District Station) ์ƒ ๊ณต์—…์šฉ๋Œ€์œ ๋Ÿ‰์ „์šฉ์ •์••๊ธฐ ( ๋นŒ๋”ฉ, ๊ณต์žฅ, ๋ณ‘์›, ํ•™๊ต ) ์‚ฐ์—…์šฉ๋Œ€์œ ๋Ÿ‰๊ธฐ

DC Link Application DC Link capacitor can be universally used for the assembly of low inductance DC buffer circuits and DC filtering, smoothing. They


Microsoft Word - Preliminary_ALT6600๋ฉ”๋‰ด์–ผ(M6600-K01C)160812

(2006)-01

D101351X0KR_May17

DIB-100_K(90x120)

(2) : :, ฮฑ. ฮฑ (3)., (3). ฮฑ ฮฑ (4) (4). (3). (1) (2) Antoine. (5) (6) 80, ฮฑ =181.08kPa, =47.38kPa.. Figure 1.

(3) () () LOSS LOSS LOSS LOSS (4) = 100 = 100 = 100 = 100 = 100 = 100 = 100 = 100 = 100 = 100 = 100 = 100

?????????????????2009-????????

F&C ํ‘œ์ง€5์ฐจ(์™ธ๋ฉด) - ์™„์„ฑ๋ณธ

1 grating steel bar grating Hot Dip Galvanized Steel Bar Grating stage flooring stair treads 2 heat resisting casting parts of refuse in

Microsoft Word - SRA-Series Manual.doc

์ €์ž‘์žํ‘œ์‹œ - ๋น„์˜๋ฆฌ - ๋ณ€๊ฒฝ๊ธˆ์ง€ 2.0 ๋Œ€ํ•œ๋ฏผ๊ตญ ์ด์šฉ์ž๋Š”์•„๋ž˜์˜์กฐ๊ฑด์„๋”ฐ๋ฅด๋Š”๊ฒฝ์šฐ์—ํ•œํ•˜์—ฌ์ž์œ ๋กญ๊ฒŒ ์ด์ €์ž‘๋ฌผ์„๋ณต์ œ, ๋ฐฐํฌ, ์ „์†ก, ์ „์‹œ, ๊ณต์—ฐ๋ฐ๋ฐฉ์†กํ• ์ˆ˜์žˆ์Šต๋‹ˆ๋‹ค. ๋‹ค์Œ๊ณผ๊ฐ™์€์กฐ๊ฑด์„๋”ฐ๋ผ์•ผํ•ฉ๋‹ˆ๋‹ค : ์ €์ž‘์žํ‘œ์‹œ. ๊ท€ํ•˜๋Š”์›์ €์ž‘์ž๋ฅผํ‘œ์‹œํ•˜์—ฌ์•ผํ•ฉ๋‹ˆ๋‹ค. ๋น„์˜๋ฆฌ. ๊ท€ํ•˜๋Š”์ด์ €์ž‘๋ฌผ์„์˜๋ฆฌ๋ชฉ์ ์œผ๋กœ์ด์šฉํ• 

WOMA Pumps - Z Line

Microsoft Word - Shield form gasket.doc

Microsoft Word - Installation and User Manual_CMD V2.2_.doc

7 LAMPS For use on a flat surface of a type 1 enclosure File No. E Pilot Lamp File No. E Type Classification Diagram - BULB Type Part Mate

Parts List

SEMI U+

13์žฅ_

E010 CYLINDER BLOCK GROUP (0 01) 76

Elix 3 Elix 5 Elix 10 RiOs 3 RiOs 5 RiOs 8 RiOs 16!.. MILLIPORE

Preliminary spec(K93,K62_Chip_081118).xls

Orcad Capture 9.x

2012๋…„ ์ •๋ณดํ†ต์‹  (12.28).pdf

ๆญฏ์ „์šฉ]

I 1 1) TESCO, 1993, ( 96, 98, 99) - : : 354 (19993 ~ , 1 =1737 ) - : 845 ( : 659 ) - : ) CM 9 (CM), CM , 2 CM, -

์ „์ž๊ตํƒ ์‚ฌ์–‘์„œ.hwp

ํšŒ์‚ฌ์†Œ๊ฐœ์„œ

SSi Super Systems Inc / DP RETURNING THE UNIT TO SSI 11 SPARE PARTS 12 APPENDIX A 13 APPENDIX B 14 Super System Inc DP2000

Contents Steam traps Engineering Data Manual & N TA N650 N450, TA, N650

์ œ๋ชฉ์—†์Œ

Extended Calculations

ๆญฏ๋ฉ”๋‰ด์–ผv2.04.doc

Microsoft PowerPoint - Powertrain_Sensor

#KM560

CFP ์ œ์ž‘(0113)

๋Œ€ํ‘œ์ด์‚ฌ ํ™•์ธ์„œ I. ํšŒ์‚ฌ์˜ ๊ฐœ์š” 1. ํšŒ์‚ฌ์˜ ๊ฐœ์š” ๊ฐ€. ํšŒ์‚ฌ์˜ ๋ฒ•์ , ์ƒ์—…์  ๋ช…์นญ ๋‹น์‚ฌ์˜ ๋ช…์นญ์€ ๋™์–‘ํ”ผ์—”์—ํ”„ ์ฃผ์‹ํšŒ์‚ฌ๋ผ๊ณ  ํ‘œ๊ธฐํ•ฉ๋‹ˆ๋‹ค. ์•ฝ์นญ์œผ๋กœ๋Š” ๋™์–‘ํ”ผ์—”์—ํ”„(์ฃผ) ๋˜๋Š” ์˜๋ฌธ์œผ๋กœ๋Š” DONGYANG P&F CO.,LTD๋ผ๊ณ  ํ‘œ๊ธฐํ•ฉ ๋‹ˆ๋‹ค. ๋‚˜. ์„ค๋ฆฝ์ผ์ž ๋‹น์‚ฌ๋Š” 1999๋…„

Manufacturing6

1. Features IR-Compact non-contact infrared thermometer measures the infrared wavelength emitted from the target spot and converts it to standard curr

ๆญฏFDA6000COP.PDF

์ตœ์ข…๋™์•„์ˆ˜์ •๋„ํ01

Microsoft Word - 1-์ฐจ์šฐ์ฐฝ.doc

IAPH289SEF_XFO1.ai

ๆญฏ๋‘์‚ฐ3.PDF

#KM857/867..

CD-6208_SM(new)

# KM


๋ชฉ์ฐจ ์›ํ•˜์‹œ๋Š” ํ™”๋ฌผ ํฌ์žฅ ์•ˆ๋‚ด๋ฅผ ํด๋ฆญํ•˜์‹ญ์‹œ์˜ค. ์ผ๋ฐ˜ ํ™”๋ฌผ ํฌ์žฅ ์•ˆ๋‚ด 3 ์ปดํ“จํ„ฐ ๊ธฐ๊ธฐ ํ™”๋ฌผ ํฌ์žฅ 9 ์ž๋™์ฐจ ๋ฐ ๊ธฐ๊ณ„ ๋ถ€ํ’ˆ ํฌ์žฅ ์•ˆ๋‚ด ๋ฐ ์„ค๊ณ„ 15 ๋ฐฐํ„ฐ๋ฆฌ ๋ฐฐ์†ก๋ฌผ ํฌ์žฅ 23

ห›ห‡

The Top Ten Moulding Problems

72129o

Genie Industries http//wwwgenieliftcom Copyright 00 Genie Industries 1, 00 1, Genie Genie Industri

์„ ํ•  ๋•Œ, ๊ฒฐ๊ตญ ์—ฌ๋Ÿฌ ๊ฐ€์ง€ ๋‹จ์–ด๋ฅผ ๋„ฃ์–ด์„œ ๋ชจ๋‘ ์ฐพ์•„์•ผ ํ•œ๋‹ค๋Š” ๊ฒƒ์ด๋‹ค. ๊ทธ ๋Ÿฌ๋‚˜ ๊ฐ€๋Šฅํ•œ ๋ชจ๋“  ์šฉ์–ด ํ‘œํ˜„์„ ์ƒ์ƒํ•˜๊ธฐ๊ฐ€ ์‰ฝ์ง€ ์•Š๊ณ , ๋˜ ๋ชจ๋‘ ์ฐพ๊ธฐ๋„ ์–ด ๋ ต๋‹ค. ์šฉ์–ด๋ฅผ ํ‘œ์ค€ํ™”ํ•˜์—ฌ ํ•œ ๊ฐ€์ง€ ํ‘œํ˜„๋งŒ ์“ฐ๋„๋ก ํ•˜์—ฌ์•ผ ํ•œ๋‹ค๊ณ  ํ•˜์ง€๋งŒ, ๋ง์€ ์‰ฌ์›Œ๋„ ๋ชจ๋“  ํ‘œ์ค€ํ™”๋œ ์šฉ์–ด๋ฅผ ์ผ์ผ์ด ์™ธ์šฐ๊ธฐ๋Š”

(Exposure) Exposure (Exposure Assesment) EMF Unknown to mechanism Health Effect (Effect) Unknown to mechanism Behavior pattern (Micro- Environment) Re

์œคํ™œ์œ  ๊ฐœ๋ฐœ ๋™ํ–ฅ ๋ฐ ์—ฐ๊ตฌ ์‚ฌ๋ก€

Microsoft Word - FS_ZigBee_Manual_V1.3.docx

Slide 1

untitled

<4D F736F F F696E74202D2028B9DFC7A5BABB2920C5C2BEE7B1A420B8F0B5E220C8BFC0B220BDC7C1F520BDC3BDBAC5DB5FC7D1B1B94E4920C0B1B5BFBFF85F F726C F72756D>

ๆญฏ๊ฒฝ์˜ํ˜์‹  ๋‹จ๊ณ„๋ณ„ ํ”„๋กœ๊ทธ๋žจ ์‚ฌ๋ก€.ppt

,,,,,, (41) ( e f f e c t ), ( c u r r e n t ) ( p o t e n t i a l difference),, ( r e s i s t a n c e ) 2,,,,,,,, (41), (42) (42) ( 41) (Ohm s law),

T100MD+

FTTH ๊ธฐ์ˆ ๋ฐœํ‘œ

KM-380BL,BLB(100908)

x4- Manualb61ยนยณยปยฟรซลก

๋Œ€ํ˜•๋””์ ค๊ธฐ๊ด€์˜ Cooled-EGR์ œ์–ด ์‹œ์Šคํ…œ ๊ฐœ๋ฐœ์— ๊ด€ํ•œ ์‹คํ—˜์  ์—ฐ๊ตฌ

2

Validation Plan Template

#KM-250ลก

BSC Discussion 1

<BAB0C3A5BABBB9AE2E687770>

B-3 B-4 HDV B-8 B-37 B-39 3S1A B-40 3S2A B-42 3S3A B-44 3S4A B-45 B-11 B-15 S1A B-16 K2A B-20 K3A B-24 S3A B-27 S4A B-30 S5A B-33 HPV5-6, HPV5-8 B-78

00.1

Microsoft PowerPoint - AC3.pptx

IBM blue-and-white template

Transcription:

1 Plant Plant, (Basic Engineering) PFD(Process Flow Diagram), P&ID (Piping &Instrument Diagram),Data Sheet Instrument Index, RFQ (Requisition For Quotation), TBE(Technical Bid Evaluation), Vendor Print Review, Loop Drawing, Hook Up Drawing, Instrument Location Plan Drawing, Control Room Layout DWG, Cable & Conduit Layout DWG, Wiring Inter-Connection DWG, Typical Detail DWG, Instrument Construction Specification 2 1),,,,,,, 2) (1) ( ) (2) Process (3) 3), (1) (2), 1

(3) Cost (4) (5) 4) (1) Job Flow, (2) (3) (4) (5) Process, 5) (1) Interlock Logic Diagram Maker (2) Plot Plan Piping Arrangement Drawing Piping Isomatric Drawing Piping Material Specification 2

(3) P & ID, UFD, PFD Process Data Shut Down System (4) ENGINEERING DRAWING EQUIPMENT LIST PACKAGE ITEMS (5), PIPE RACK & STRUCTURE DRAWING (6) MAIN CABLE PLAN HAZARDOUS AREA PLAN 6) (1) ( INSTRUMENT PIPING HOOK-UP) (2) (INSTRUMENT STEAM TRACING HOOK-UP) (3) (INSTRUMENT ANALYZER PIPING HOOK-UP) (4) (CONTROL ROOM ARRANGEMENT PLAN) (5) (CONTROL ROOM WIRING PLAN) (6) DUCT/TRAY (INSTRUMENT DUCT/TRAY PLAN) (7) (INSTRUMENT MAIN CABLE PLAN) (8) (INSTRUMENT LOCATION PLAN) (9) (INSTRUMENT WIRING PLAN) (10) (INSTRUMENT AIR PIPING PLAN) (11) (INSTRUMENT SCHEMATIC LOOP DIAGRAM) (12), (INSTRUMENT CONNECTION LIST) (13) (INSTRUMENT TYPICAL DETAIL DRAWING) (14)INSTRUMENT KEY PLAN (15)SYMBOL & LEGEND 3

3 (SCOPE OF WORK) 1), (1) MANHOLE, PIT, CABLE DUCT, CABLE TRAY, CABLE TRENCH, DUCT BANK (2), (3) CONTROL ROOM LAYOUT, PANEL, CABLE ROUTE 2) (1) NOZZLE POINT & SIZE (2), SUPPORT STAGE (3) PACKAGE ITEMS WORK SCOPE 3) (1) CABLE DUCT/TRAY ROUTE, (2) IMPULSE LINE SCOPE (3) AIR PIPING & UTILITY SCOPE (4) SCOPE (5), UTILITY (6) IN-LINE INST * RESPONSIBILITY SCOPE OF WORK BETWEEN INSTRUMENT & PIPING WORK SCOPE JOB PIPING 4) (1) CABLE ROUTE (2) INTERLOCK SEQUENCE, RUNNING LAMP SCOPE (3) SCOPE (4) SCOPE (5) CONSENT 4

5) / (1), ITEM (2) ITEMS (3) 4 1) PANEL ARRANGEMENT IN THE CONTROL ROOM (1) (2) ( DOOR OPENING ) (3) FUTURE (4),, CCTV,,PACKAGE (5) CABLE, DUCT/TRAY, TRENCH ROUTE (6) PANEL - FLOOR - - PANEL ( ) - CHANNEL BASE (7) PANEL (8) (,,, ) (9) (10) (11) CABLE 2) LOCATION PLAN (1) MONITORING (OPERATION) (2) (3) ACCESS (4) P&ID CHECK (5) TAPPING TRANSMITTER ( PIPING HOOK-UP DWG ) (6) -, - SAMPLING LINE, - (, ) 3) DUCT/TRAY PLAN 5

(1) ROUTE (2) ( ) (3) EQUIPMENT (4) LEVEL (5) CABLE (6) SUPPORT POINT (7) CABLE (8) CABLE, SIZE (9) SYSTEM CABLE DATA HIGHWAY (10) SEPARATION (11) PART COORDINATION SCOPE OF WORK (12) FUTURE 4) WIRING PLAN (1) (2), (3) LEVEL (4) (5) CLASS (6) ROUTE (7) CABLE (8) DIGITAL SYSTEM CABLE DATA HIGHWAY CABLE (9) (10) PART SCOPE OF WORK 5) AIR PIPING & SIGNAL TUBING PLAN (1) INST- AIR (2) INST- AIR, (3) INST- AIR PART SCOPE (4) PLANT AIR (5) AIR TANK MAIN HEADER SIZE (6) BLOCK VALVE SIZE (7) 1 PILOT AIR (8) PILOT SIZE (9) ROUTE (10) PART SCOPE OF WORK (11) SPARE & FUTURE 6

(12) - - JB -, - SUPPORT - SPARE 6) PROCESS (1) PROCESS -, - (2) - TYPE (3) -,, TAP (4) TRACING - ( ) - TRACING INSULATION TYPE - - (5) IMPULSE LINE (6) TAP (7) - (,, ) - ( ) - - - - (8) SEAL POT CONDENSATE POT (9) TUBING TYPE PIPING TYPE -,,, COST (, ) (10) PART SCOPE OF WORK (11) SERVICE -, SERVICE ( / ) -, SERVICE ( HEAD / ) - SERVICE ( SEAL / 7

PURGE ) - SERVICE 5 1) Instrument Index(Instrument Schedule) P&ID Instrument Index Construction DWG Instrument Specification Operating Condition (1) P & ID Data Sheet List / Tag No Instrument Specification Operating Condition (2) Vendor Print Up- Date (3) Reference DWG No Loop DWG, RFQ No ( Data Base Sorting ) (4) Final Vendor Print Instrument Specification Function Test As Built (5) Document SK STD DWG ESD-70240 2) RFQ (Requisition For Quotation) (Specification),,,Recommended Vendor List, Commercial (1) Process Data Sheet Instrument Data Sheet Sample Instrument Type, Input Range, Output Signal, Area 8

Clarification, Process Connection Type, Accessary (2) Sample ( SK ENGINEERING STD) ) โถ Process Orifice Type ( Concentric, Eccentric,etc) โท Specify Manufacturer Standard โธ Orifice Bore โน Plate โบ Ring Material Type โป Manufacturer Model No โผ Orifice Tape Type โฝ Tape Size โพ Orifice Flange Type ( ) โฟ Line Class Orifice Flange Material Meter Meter Type, D/P Range, Scale Range Process Data Sheet Plate & Flange BETA=d/D Ratio Vent/Drain Hole, Plate Thickness ( SK ESS ) 9

PROJECT SPECIFICATION FLOW INSTRUMENTS NO SHEET DATE PREPARE D REV OF CHECKED APPOVE D O R I F I C E P L A T E S O R I F I C E F L A N G E S โถCONCENTRIC OTHER โผTAPS:FLANGE VENA CONTRACT PIPE OTHER โทMFR STANDAR OTHER โฝTAP SIZE: 1/2 NPT OTHER โธBORE: MAXIMUM RATE NEAREST 1/8 โพTYPE: WELD NECK SLIP ON THREADED โนMATERIAL:304SS 316SS OTHER โฟMATERIAL:STEEL OTHER โบRING MATERIAL & TYPE 11FLANGES INCLUDED BY OTHER โปMFRMODEL NUMBER F L U I D D A T A M E T E R 12 TAG NUMBER 31 TYPE OF METER 13 SERVICE 32 DIFF PRESS RANGE 14 LINE NO 33 SCALE RANGE 15 FLUID STATE 34 16 MAXFLOW (kg/hr) 35 17 NORFLOW (kg/hr) 36 18 PRESSURE 37 (kg/cm2g) 19 TEMPERATURE P L A T E & F L A N G E 20 SpGr @BASE 41 BETA=d/D 21 SpGr @OPERTEMP 42 ORIFICE BORE DIAMETER 22 MOL WEIGHT 43 LINE ID 23 VISCOSITY @OPER 44 FLANGE RATING cp 24 45 VENT OR DRAIN HOLE 25 46 PLATE THICKNESS NOTE 1VENDOR SHALL STAMP UPSTREAM SIDE OF ORIFICE PLATE WITH TAGNO,MATERIAL, LINE SIZE, FLANGE RATING & BORE AS A MINIMUM 2THE ORIFICE BORE DIAMETER IS ADJUSTED FOR THE VENT / DRAIN (VENT / DRAIN HOLE DIAMETER ARE PER ISA STANDARD ISA-RP32) BETA IS EXPRESSED AS THE RATIO OF THE ADJUSTED ORIFICE BORE DIAMETER OVER THE LINE ID 10

3) TBE(Technical Bid Evaluation) Bidder Requirement,, (1) Bidder ( ) TBE (2) RFQ Instrument Data Sheet Vendor / Table (3) Bidder Clarification Letter TBE (4) Cost,,, Maintenance, Spare Parts Project Bidder, 4) Vendor Print Review TBE Vendor Approval DWG Construction DWG, Final Vendor Print (1) APPROVAL DWG POWER CONSUMTION, AIR, HOOK-UP DWG (2) FINAL VENDOR PRINT COMMENTS 11

6 1) (CONTROL ROOM EQUIPMENT LAYOUT ) CONTROL ROOM PANELS PLANT,,, FUTURE PANEL, CABLE (1) CABINET RACK ROOM DCS CABINET, PACKAGE PANEL CONVENTIONAL PANEL, PANEL CABLE (2),, CCTV,, PACKAGE (3) (4)PANEL, 2) (CONTROL ROOM WIRING) (1) CABLE DUCT, TRAY TRENCH (2)TRENCH Cable Inform (3)DUCT/TRAY, DUCT/TRAY CABLE CONTROL ROOM SEALING SEALING (4) ACCESS FLOOR CABLE DUCT/TRAY, 12

CABLE SIGNAL, POWER, SYSTEM CABLE DUCT TRAY CABLE TRAY, SIGNAL, POWER CABLE, TRAY SEPARATOR TRAY 3m 30x30x5t ANGLE TRAY ACCESS FLOOR DESIGN (5) CABLE (6) CABLE DUCT/TRAY PROCESS AREA CONTROL ROOM CABLE MANHOLE 3) (INSTRUMENT PIPING HOOKUP) EQUIPMENT(VESSEL, TANK,HEATER ), DUCT, PROCESS ROCESS LEADING, (1) PROCESS,,,,,,,,,, 13

(2), MANUAL,,, 1 - ZERO (3) (a) (b) PIPING TUBING TYPE 2 PIPING TUBING TUBING (a) PIPE (b) (c) (d) (e) 14

(f) TYPE (g) (h) TUBE CARBON STEEL (i) LEAK ERROR TUBE VIBRATION LEAK VIBRATION PROCESS CONDITION 600# RATING ) 2 ) 28 - (6) PROJECT (CLIENT) (4) SIZE,,,, PROJECT 1/4 1/2, 1/2 (5),, TAP POINT EQUIPMENT MAT L CODE PIPING MATERIAL SPEC PIPING MAT L SPEC ( / ) 1M, 100 C 15

SEAL POT SEAL POINT SEAL POT, SEAL (6),,, (a) : (b) : (c) : CONDENSE POT CONDENSE POT SEAL PROCESS ( ) ORIFICE TAP SK Engineering Standard (a) TAP i) : (45 TAP) PROCESS LINE RETURN, 45 16

ii) :, PROCESS LINERETURN iii) 45 TAP (b) i) CONDENSATE ii) DRY LEG WET LEG WET LEG SEAL POT DRY LEG WET LEG (a) TOWER NOZZEL NOZZEL NOZZEL 0 (b) (c) L, U (d) SEAL POT SEAL, SEAL OVER PROCESS SEAL 17

( : ) (a) PROCESS ( ) TAP SK Engineering Standard (b) (b) SEAL POT (c) SYPHON TUBE (e) PUMP DISCHARGE PULSATION DAMPUNER LIQUID FILLED TYPE ( GAUGE ) SEAL POT CONDENSE POT (a) CONDENSE POT (Steam) * 200 STEAM LINE (b) SEAL POT i ) HIGH VISCOSITY FLUID ii) iii)wet LEG LEVEL iv),, HOOKUP TYPE i) GRADE MOUNTED (STANCHION TYPE) ii)line MOUNTED 18

19 a) (5) (EQUALIZING LINE), 0 b) c) ( 2m ) LNG 180 120, LPG 30 d) 2m 1

e) f) Dry Leg - g) SEAL POT SEAL PURGE PURGE, SEAL, PURGE h) TAP 1/2B 3/4B 1B PURGE PURGE TRACE,,, DRY LEG TRACE TRACE 2 20

(a) STEAM TRACING (b) ELECTRIC TRACING ) STEAM TRACING, PROJECT ELECTRIC TRACING * STEAM TRACING (a) CONDENSATE POT CONDENSATE POT TRACING (b) TRACE 30 8mm, 30 (c) TRACE STEAM TRAP ( SCOPE) (d) TRACE CONDENSE HEADER PROCESS 1/100 (e) 3~7 / G TRACE HEADER ( ) 1/2 2 3/4 5 1 10 11/2 20 * ( INSULATION) (300 ), (330 ), (a) 21

, (b), (c) 0 FELT, GLASS FIBER FELT, FELT,, FOAM POLYSTYLENE, FOAM GLASS, FOAM VINYLE, FOAM POLYURETHANE (d),, Plastic Tape, CEMENT MORTAR, PLASTER, PLASTER, HARD CEMENT (e) 4) INSTRUMENT KEY PLAN PLANT AREA AREA DWG NO AREA PLAN INDEX KEY PLAN (1) OVERALL PLOT PLAN CABLE AIR LINE P&ID SCALE SIZE SCALE ) STANDARD A0 A1 SIZE SCALE M/H ( MATCH POINT 22

) 5) INSTRUMENT LOCATION PLAN (1) INSTRUMENT LOCATION (a) INSTRUMENT LOOP DIAGRAM (b) INSTRUMENT PIPING HOOKUP (c) P&ID (d) PIPING G/A DWG (e) ENGINEERING DWG (2) ( : LG,PG) PANEL (3) (4) 2 STANCHION PIPE 1500mm (5) HOLD MARK 6) INSTRUMENT (DUCT/TRAY) PLAN & MAIN CABLE PLAN,, STRUCTURE EQUIPMENT CABLE PULLING, (1) PLOT PLAN PIPE RACK, PIPIE RACK, STEEL STRUCTURE,,DUCT, TRAY, TRENCH ROAD CROSSING, MANHOLE, SEALING 23

,,, ( DUCT, TRAY, TRENCH, DUCT BANK ) SIZE, PIPERACK DUCT (CABLE ), DUCT/TRAY TRAY ELEVATION, PIPE RACK ( ) CABLE SPECIAL FITTING CABLE CABLE PULLING CONDUIT (2) CABLE DUCT PIPE RACK DUCT/TRAY SUPPORT 3M RACK 3M RACK L/E 3M SUPPORT PIPE RACK DUCT CABLE DUCT 20% % CABLE FUTURE DUCT SIZE DUCT SIZE DUCT HIGHT DUCT, PIPERACK SPACE SUPPORT DESIGN HAND BOOK SIZE DUCT SEPARATOR LEVEL DUCT 23 mm 32 mm, 600mm SIZE 32mm 23mm, DUCT COVER 23 mm 16 mm DUCT BODY 32mm COVER 23mm, 23mm 16mm 24

(3) DUCT SEALING SEALING GAS CONTROL ROOM (A) DUCT SEALING SEALING SEALING (*4) (*1) Duct DUCT Duct *2 Drain hole(*3) *1 Duct *2 Duct *3 (DRAIN HOLE) *4 Duct (A) DUCT SEAL (4) TRENCH TRENCH SIZE TRENCH SIZE ROUTE INFORM INFORM CABLE TRENCH 20% TRENCH 25

TRENCH CABLE PULLING CABLE TRENCH SEALING GL 0 *2 *1 CABLE *1 *2 GL (a) GL GL *1 CABL *1 (b) GL (5) TROUGH DUCT,TRENCH,DUCT BANK 26

CABLE TROUGH, TROUGH 12M, 60CM (6) DUCT BANK TRENCH ROAD CROSSING DUCT BANK DUCT BANK INSTRUMENT DESIGN HANDBOOK (7) CULVERT TRENCH ROAD CROSSING CABLE PULLING 7) INSTRUMENT WIRING PLAN,, LOOP - LEVEL (1) 110VAC,220VAC 100VDC, 24VDC 100 ~110V 200V CONDUIT AC DC (a) CABLE 600V (mm2) MIN- 20mm2 SIZE 27

CABLE SIZE INSTRUMENT DESIGN HAND BOOK (b) DUCT, TRENCH,TRAY SEPARATOR LOCAL CONTROL ROOM DCS ANALOG,, PULSE (a) LOW LEVEL SIGNAL : 4~20mA DC,PULSE SIGNAL, RTD, ANALYZER, GAS DETECTOR, FIRE ALARM ONOFF SIGNAL( DC 24V), SOLENOID VALVE(DC 24V), INST-POWER(DC 24V) THERMOCOUPLE SIGNAL, DATA COMMUNICATION SIGNAL (b) HIGH LEVEL SIGNAL: ONOFF SIGNAL(AC 110V,DC110V), PAGING(PLANT COMMUNICATION) SOLENOID VALVE( AC110V, DC110V), INST- POWER( AC110V/220V, AC110V) (c) INTRINSIC SAFETY SIGNAL CABLE DUCT/TRAY,TRENCH (a) CABLE SIZE INST HAND BOOK TABLE (b) SIZE MAX- 11/2 ( 42mm) 2 (c) JB HUB 11/2 (42mm) CONDUIT SIZE JB 11/2 (42mm) JUNCTION BOX (a) JUNCTION BOX LEVEL (b) JUNCTION BOX POLE MIN- 20P MAX 120P SIZE 28

JB SIZE, (c) JOB SPARE POLE 10~20% (d) MULTI CABLE CABLE CABLE ex) 10C, 20C, 30C / 5P, 10P, 15P (2) (NOISE) (a) : (b) : : SHIELD COMMON NOISE a) b) DUCT SEPARATOR c) : SHIELD CABLE CABLE DUCT d) : SHIELD CABLE TWIST PAIR CABLE e) : 2 29

1 NOISE (CASE), (NOISE) SHIELD GROUND SIGNAL LINE SYSTEM GROUND SYSTEM MFR INFORM ENG ER ( ) 1, 2, 33 4 - SIGNAL LINE SYSTEM (ex: DCS, PLC ) 3 ( 100Ω ) JB, LOCAL PANEL ENG ER INFORM GROUNDING (a) 1 : - ( : 10 Ω ) (b) 2 : (c) 3 : 300V ( : 100 Ω ) (d) 3 : 300V ( : 0 Ω ) ( ) (a) (b) (c) CABLE DUCT / TRAY 30

( ) (a) : 14 (b) : 20 (c) : 20 (d) DUCT/TRAY : 55 (e) : 14 8) INSTRUMENT AIR PIPING ( ) AIR COMPRESSOR DRY UNIT 6~7 / G (MAIN HEADER) (MAIN HEADER) N2 GAS GAS (1) RESERVIOR, ( PILOT ) INSTRUMENT DESIGN HAND BOOK (2) TAKE-OFF VALVE ( VALVE) TAKE-OFF VALVE, SIZE INFORMATION (3) 1/2 30M (4) TAKE-OFF VALVE 1 1/2 SPARE VALVE FUTURE (5) CONTINUES CONTROL VALVE ONOFF VALVE TAKE-UP VALVE (6) CONTROL VALVE 14 kg/cm2 ON-OFF VALVE, CYLINDER VALVE VALVE 31

(7), 02 ~ 10 /,, (a) 6mm, 8mm 2 30m 50m 100m 200m 6/4mm 09 15 25 5 9 8/6mm 07 1 2 35 6 : 300m (b) 6/4mm 70m (c) 2) HUNTING TANK, 10m 32