기회의땅, 사우디아라비아급변하는한반도, 중동핵상황 원자력엘리트스쿨 1. 5. 25. 김병구 bkkim9@gmail.com
목차 사우디의원자력프로그램 SMART Partnership SMART next steps 대형원전사업 한반도핵정세 중동핵정세 결론
Nuclear Silk Road published in 3 languages
Why nuclear power in KSA? Post-oil era, reduce oil dependence by 50% 1/3 oil for domestic, replace by nuclear Transformation to high-tech supply chain Technology IP ownership Export market following prototype Nuclear HCB, 65% Saudization target Renewable: 장치산업, nuclear: 고급일자리 (UAE: 전력생산, KSA: 인력양성 )
급변하는사우디정세 MBS 주도하 Vision 30 집행단계 개방, 개혁, 초대형첨단사업 NEOM, Qiddiya 등 재원조달 : Aramco 주식최초상장, 유가상승 K.A.CARE 역할재정립진행중 초대형태양광사업, MOE/Aramco 직영체제 기관장공석, MOE 장관대행체제 원자력규제기관독립단계 신규원전건설사업주 Nuclear Holding Co 설립중 기존 R&D, National Nuclear Lab 체제도입구상 원전부지확보단계 대형 LR: 동해안카타르국경 Barakah 인접지역 소형 SMR: 서해안홍해변 Yanbu 지역
SMART Partnership Share SMART Technology Ownership through Pre-Project Engineering and FOAK plant construction in KSA Patents, IT Program, Background Information and Generated Information First nuclear power technology transfer export Joint Marketing of SMART in MENA region Establish SPC(SMART Power Co. + KHNP) as a SMART Vendor (Project Executer) K.A.CARE HCB for SMART NSSS design First Saudi nuclear manpower overseas training in Korea
SMART Partnership Approach Development Stage Commercialization Stage Korea Support SMART Development SMART Development Technology Validation Licensing Safety Enhancement for Post Fukushima Action Plan Korea & KSA Joint Support Pre-Project Engineering FOAK Engineering Design K.A.CARE HCB PSAR KSA Support FOAK Plant Construction 2 FOAK Plants Construction Joint Design Approach Licensing(CP, OL) 1997 ~ 14 ~3 Yr 5~6 Yr At Present 10
SMART-PPE design project Pre-project engineering for prototype (Dec. 15) 41+7 K.A.CARE design team dispatched to Korea (July 16) CRT-Basic, CRT-Technical, OJT completed. OJP started (Dec. 17) FOAK engineering, PSAR to be completed (Nov. 1) Preparation for FOAK plant construction: SPC 한수원주도역할기대
DNBR 10 O 2.0 1. 1.6 1.4 MS FW A B C N N D 24 16 24 E 90 O 16 16 270 O F 24 16 24 G 2.60 w/o U-235 21 FA 4.0 w/o U-235 36 FA N indicates No. of Gd rod 피동잔열제거계통 ECT PRHRS HX Limit DNBR = 1.41 H Containment J SLB Feed Flow Increase STEAM Flow Increase FLB CEA Withdrawal CLOF Locker Rotor SGTR 1.2 0 40 60 0 100 1 140 160 Time, sec 0 O RDT RV 1 2 3 4 5 6 7 9 LHX RHX IRWST Water Level, m 화학및체적제어계통 Pressure, MPa LETDOWN CONTROL VALVE M 10 6 4 2 EDT F CHARGING CONTROL VLAVE BRM PRM M RDP M PIX Chemical Addition System CCP M PPE Scope of Engineering PHIX VCT M M 정지냉각계통 SIP GS 안전주입계통 OUTSIDE (YARD) BAST HUT BABT HUP BAC RMWP EDUCTOR BAMP SCP SCHX BA CIX RMWT 0 450 0 6000 100 1000 Time, sec 1 16 14 10 FLB CLOF CEA Withdrawal Locked Rotor SLB SGTR RV Collapsed Water level Top of Core Hot Spot Cad Surface Temperature Pressure Limit = 1.7 MPa 0 10 30 40 50 Time, sec 650 610 570 530 490 Temperature, K 증기 발생 기 급수구역격리밸브 증기구역격리밸브 증기구역격리밸브 급수구역격리밸브 급수격리밸브 급수격리밸브 주증기격리밸브 주증기격리밸브 급수펌프 기동우회냉각기 급수펌프 우회증기냉각기 우회증기냉각기 비상보충수탱크 비상보충수탱크 기동우회냉각기 C P P C P P 복수펌프 복수기 복수기 터빈발전기 터빈발전기 냉각탑 순환수조 2 차측기기 순환수펌프 복수펌프 2 차측냉각수펌프 NSSS Design Fuel Design Component Design BOP/AE Design Core Design Main Feedwater and Main Steam Fuel Design Mechanical Design Component Design System Design General Arrangement Component Design Analysis MMIS Design Containment Building Over 1500 Simulations Confirm Safety SBLOCA DNBR Pressure Safety Analysis Fuel Assembly Design Equipment Vendor Survey Aux. system Design
PPE Safety Features PPE SDA
SMART 1,2 Units Bird s-eye View
Post-PPE SMART next steps Saudi critical manpower build-up 41 + 17 NSSS design engineers (KAERI) 17 regulatory manpower (KINS) Site screening and characterization Saudi regulatory site approval 2-track regulatory licensing approach Standard Design Change Approval (Korean-side) PSAR submittal for Construction Permit (KSA-side) Start FOAK plant construction Construction contract from Nuclear Holding Co.
Riyadh June 23, 16
Nuclear Power Plants in the Silk Road Countries (10)
사우디대형원전 LR 사업 Vision 30 석유의존도반감정책의일환 기술인력위주의 SMR, 전력생산위주의 LR 동일 K.A.CARE 원자력청이 SMR/LR 사업주관 원자력규제기관, 원전사업자 NHC 발족 10 1400 MWe 2 기입찰의향서 입찰의지 5 개국중 shortlist 발표임박 KEPCO 주도, 한미간협조가능성 UAE Barakah 원전의건설실적
북한비핵화 Denuclearization 정세 남북, 북미정상회담핵심의제, terminate 풍계리핵실험장폐쇄 기본전제 CVID 주요내용, 일괄적 / 단계적 C: 원자로, 재처리, 농축, 핵물질 / 탄두 ( 전량?), 실험장등 V: IAEA 검증 / 사찰, 미국사찰, 국가사찰 I: 시설 / 물질복구불능화, 핵전문인력활용방안 D: 시설영구폐쇄, 핵물질제거 한국기술진기대역할 방사선오염, 해체, 처리 / 처분기술지원 기존원전으로전력공급, 신규원전건설시지원 북한핵기술인력활용공동연구
북한핵기술자활용방안구소련 ISTC 핵기술자지원사례분석 WMD 관련기술자지원차 ISTC 설립 (1990 - ) 설립이사국 : 미, EU, 일, 러 공동과제참여국 : 한국등 과학기술자 4 등급분류 : 특, 1,2,3 등급 인건비 + 연구비서방보장, 주거제한 한국판 ISTC 개념가능성, 북핵기술자수천명대상 핵시설제염, 해체 환경방사성오염복원 원자력발전재개시기술지원 공동이사국 : 남북한, 미, 일, 러, 중등 북핵인적자원 database 확보
이란의원자력프로그램 IAEA 회원국, NPT 준수국 방대한원자력연구, 기술, 핵주기시설확보 1979 년이란혁명후서방세계와단절 중동유일의원전 Bushehr-1 가동중 (11) 1975 Siemens 착수, 이폭격, 러 VVER 1000 MWe 원전핵연료용으로농축기술확보 IAEA 사찰수용, 핵협상 JCPOA 후비확산준수 북한과의차이점 : 핵협상국제외교력인정, 주변국에테러지원국오명, 시아파의맹주
이란 JCPOA 핵협상정세 이란, P5+1 JCPOA 핵협정타결 (15.7.) 미국, 핵협정일방적탈퇴 (1.5.) CVID 시각에서태부족 지지국 : 이스라엘, 사우디, 바레인, UAE only 북핵문제해결에미칠영향 CVID 형태핵타결강조메시지 미국의국제적신뢰성? 사우디원자력정책에미칠영향 친미외교강화, 원전수주가능성 반이스라엘보다반시아파우선
이란, 북한원전의교훈 이란 / 북한 혈맹 관계 농축기술 / 미사일기술상호제공? 최악의대미정책, 경제제재대상국 이란 Bushehr 원전 1000 MWe VVER 40 년전독착수, 이푹격, 러로형변경후가동성공 Natanz 농축공장운영명분 신포 KEDO 원전건설사업 2x1000 MWe PWR, 북미간 AF 협약후건설착수 (1995) 한국형원전 ( 울진 3/4 참조 ), 한국 70% 비용지원 북한농축발견후 KEDO 해체, 35% 공정, $1.5b (06) 최초해외원전사업모델, UAE 원전수주와직결 (09) 신포건설현장, 두산공장, 장기저장보호조치유지중
결론 국내원자력계현황타개책 사우디, 제 2 원전수출의선두주자 국내 탈원전 정책, 해외수출 신의축복 활로 사우디 2 대원자력국책사업으로추진중 대형원전공개입찰 shortlist 임박 소형 SMART 선인력양성, 후시범로건설 사우디기술인력후속사업, NNL 설립공동추진 사우디원전, 이란핵, 북한비핵화해결, 우리에게기회